Rast Iron Works was relocating to a new site. Their new facilities included heavy steel manufacturing and office space. Careful consideration was given to work flow and transportation in the manufacturing design. While the main structure was a pre-engineered metal building it was re-enforced to accommodate overhead cranes. The final design allowed for multiple manufacturing operations to happen simultaneously.